The cost of this is 736 where as the the previous tech that grants a weapon, Plasma Projection costs 808. Also the equal weapon Tier for Mass Driver weapons, Quantum Drivers costs 1700. I am going to take a guess and say Energy Phasing should be 1736. This applies to all tech trees.